Our Process
Servicing San Antonio, TX & Surrounding Areas
Our Process
First Visit & Deposit
Meet with Z7 Concrete at your property. We’ll go over your possible options, determine the best location based off elevation measurements and survey study. When you are ready for the next step, we will send over our construction service agreement for you to review. Once signed, that 5% deposit will be collected along with the construction service agreement.
Survey & Property Study
An extensive study is conducted to determine what is possible on your property. An up-to-date survey is required for a thorough evaluation. If there’s isn’t a current survey available, Z7 Concrete may obtain one for an additional charge
Design & Materials Selection
A customized 3D rendering is created to show the project down to the most minimal detail allowing you to see all materials and facilitate the selection process.
Plan Prep & Permitting
Architectural and foundation plans are prepared. Our architect/designer is responsible for designing beautiful and functional projects, while our civil engineer provides the technical expertise required to ensure that these designs are structurally sound and compliant with local codes and regulations. By working closely with both professionals, we can ensure that our designs not only look stunning but also function optimally and meet all necessary safety requirements.
Construction
Once the permit and HOA submissions have been approved we will assign a team to the project, and begin digging.
Permit Process
Submissions
Meet with Z7 Concrete at your property. We’ll go over your possible options, determine the best location based off elevation measurements and survey study. When you are ready for the next step, we will send over our construction service agreement for you to review. Once signed, that 5% deposit will be collected along with the construction service agreement.
Review
An extensive study is conducted to determine what is possible on your property. An up-to-date survey is required for a thorough evaluation. If there’s isn’t a current survey available, Z7 Concrete may obtain one for an additional charge
Feedback & Corrections
A customized 3D rendering is created to show the project down to the most minimal detail allowing you to see all materials and facilitate the selection process.
Approval
Architectural and foundation plans are prepared. Our architect/designer is responsible for designing beautiful and functional projects, while our civil engineer provides the technical expertise required to ensure that these designs are structurally sound and compliant with local codes and regulations. By working closely with both professionals, we can ensure that our designs not only look stunning but also function optimally and meet all necessary safety requirements.
Inspections
Once the permit and HOA submissions have been approved we will assign a team to the project, and begin digging.
Important
Please remember, the time it takes to get a permit can vary greatly depending on your local area’s workload, the complexity of your project, and additional permits per municipality. We will proceed with the permitting process when we receive your first payment.
Site Preparation
Before we dig, 811 is called to locate all underground utilities in the property.
Any irrigation interfering with the construction’s location can either be capped for free, or relocated for an additional charge.
FAQ
Do I need A Permit?
The requirements vary by location. During the feasibility study, we will examine your property and municipal codes to determine all necessary permits. Units with water and sewage hook-ups typically require a permit, regardless of the structure’s size. Elbow Room will ensure clear communication of updates and timelines throughout the permitting process.
What Kind Of Foundation Is Used?
include 4-6″ slab on grade foundation. Sites with a slope may use a thicker slab or in-ground pier and beam. We will provide a quote for sites that need adjustments for a slope beyond the Scope of Work.
How Does Your Payment Plan Work?
Initial Financial Commitment:
A 5% deposit is required in order to save your spot. This deposit will begin the study of your property and the designing of your project. If you decide not to move forward, your deposit will be refunded.
Material Mobilization
The first 30% payment is due when construction materials are mobilized.
Foundation Completion
A second 30% payment is required upon the completion of your foundation.
Framing Completion
The third and final 30% payment is due following the rough-in phase.
Completion and Occupancy
A final payment of 5% is due at the project’s completion just before occpancy in order to activate the warranty.
Is There Warranty?
There is a one-year warranty on craftsmanship, materials, and construction. All manufacturers warranties are transferrable. Engineered foundations have a 10-year warranty.